HONGYANG GROUP Maldives Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Maldives Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

K-GA44Q FUEL DISPENSER

fuel-dispenser

K-GA44Q FUEL DISPENSER

FlowMeter Type :Optional

Accuracy ±0.2%

Pressure Loss (kg/cm): Under 0.25

Motor Voltage(V): 110V/220V/380V,50Hz/60Hz

Capacity(hp) :1HP(0.75kw)

Input Voltage :110V/220V/380V,50Hz/60Hz

Nozzle : Auto Shut-off Nozzle

Environmental Condition : -40~~+55degree

Control Type : Solenold Vale Control Type

Preset : Function Provided(Small LCDIndicator)

Display(Counter) :Type LCD and Bright Backlight

Digit of Volume : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Optional Display: Type LCD and Bright Backlight

Digit of Volume : 0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount :0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price :0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Totalizer: 1~~9,999,999

Hose :4.5m

Weight :280kg

Dimension(L×W×H) : 1540*690*2210(mm)

Dimension(L×W×H)Of Qty of Container :40ft: 29

products links

links

technical archives

    fuel dispenser Main frame installation The installation method of submersible pump fuel dispenser is similar to that of suction pump fuel dispenser. The horizontal distance from main frame to underground tank is no more than 60m, vertical distance no exceeding 4m, delivering pipe with less 0.2% slant, elbow as few as possible. Power supply lead, control line and communicating cable are installed respectively. Main wire pipe adopts 2’�seamless steel pipe, branch 1 1/2 ‘� Pressure testing of pipe should be conducted strictly in accordance with stipulation of GB50156 because the working pressure of submersible pump is 0.25~~0.3Mpa, even 0.63Mpa in instance. Safety valve should be installed in submersible pump fuel dispenser, connecting pipe with stainless steel corrugated pipe. It should be installed at the angel iron fixed in concrete, connecting with pipe. (Illustrated in Diagram 5-11) 1.1 Electric installation Electric installation includes power supply installation and connection of fuel dispenser with junction box assembly. 1: Oil filter end 2: Gasket 3: Check valve 4: Pipe 5: Safety valve 6: U-shape br fuel dispenser acket 7: Angle iron 8: Upper flange 9: Corrugated pipe 10: Low flange Diagram 5-11: Inlet connection sketch map of fuel dispenser Power supply installation (reference to Diagram 5-12): adopting oil-resistance and erosive resistance three threads copper cable, section no less than 1mm2, outside diameter about 8mmm. User’s lines and signal cable are connected into explosion-proof junc fuel dispenser tion box. 1.2 Junction box installation There are many items installed in Junction box, including terminal, power breaker (switchers of power and fuel dispensers), touch-switch, hot protection relay, general relay controlled by low voltage, signal terminal and control board of submersible pump. Other installations should be conducted strictly in accordance with electric control drawing. 1.3 Submersible pump installation Submersible pump is delivering equipment with positive pressure, which fuel dispenser

technical specification

    o the IFSF Dispenser  Application.  Please note that a PCDs may also control devices other than dispensers.   123.4   Proprietary Pump Protocol Site Controller   IFSF Dispenser Protocol   Protocols   Converter (Control Device)   Device   123.4   Proprietary Pump   Protocols  The PCD may have a one to one relationship with a dispenserpump or may be capable of  controlling several dispensers. In some circumstances the PCD may actually reside physically  in the dispenser. It is also foreseen that more than one PCD may be connected to the SCCD.  The task that a PCD has to accomplish is to successfully make the SCCD believe that it is  communicating directly with a fully IFSF compatible device.  6.2 Configuration of the PCD  The PCD can not expect to receive configuration from the IFSF SCCD as the SCCD wil fuel dispenser l not  have all the required configuration information required for a device controlling different types  of dispenserpumps. Hence the PCD supplier will have to provide the means of configuring  their device separately.  Some PCD Parameters that will not be known by the IFSF SCCD are:   Link between Proprietary device address and the IFSF logical (LNA) address.   Propr fuel dispenser ietary protocol used by the proprietary devices.   Default values for varies IFSF and non IFSF parameters.   Etc.  6.3 Device Addressing  FP31_2.23 IFSF - STANDARD FORECOURT PROTOCOL March 2006   DISPENSER APPLICATION   Page: 138  The PCD may be controlling more than one proprietary dispenser. Hence there is fuel dispenser

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    n- up to the last presidential race, in 2003, meant that about 40% of Nigeria s oil production had to be shut down. Since a 15-year-long stint of military rule ended in 1999, Mr Obasanjo has struggled, largely in vain, to bring benefits to ordinary Nigerians. Corruption and political thuggery are still messing things up. MEND looks more sophisticated and may become more of a menace than previous rebel groups; its attacks in the delta are more co-ordinated. “This is a compact, well-trained group,�says Dimieari von Kemedi, an expert on security and politics in the delta, “but one that may have the capacity to grow as things unravel.�A senior Shell security official has said that Nigeria is losing control of the delta. © 2006 . Russia and the West A colder coming we have of it Jan 19th 2006 | MOSCOW From The Economist print edition AFP Vladimir Putin may prove mildly constructive over Iran, but as Russia assumes the G8 presidency, he is not the partner the West once hoped for Get article bac fuel dispenser kground A POSSIBLY apocryphal story has it that, in the 1980s, Soviet troops in East Germany had to attend sessions of political instruction. Insubordinate air-force officers would skip the indoctrination and congregate at the buffet, where an ingratiating KGB man would try to wheedle them back in. The officers called him the “head of the club� His name was Vladimir Putin. Twent fuel dispenser y-odd years later, the KGB-man-turned-president is head of another club the G8 group of rich countries, whose presidency Russia assumed at the start of the year. Not so long ago, the idea of Mr Putin presiding over a gathering of free-market democracies might have seemed optimistic, but not altogether implausible. Yet, even before the gas-to-Ukraine squabble that marked the start of the year, Russia s membership of the G8 was looking hard to reconcile with its trajectory under Mr Putin. fuel dispenser