HONGYANG GROUP Maldives Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Maldives Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

S-GA4Q FUEL DISPENSER

S-GA4Q

S-GA4Q FUEL DISPENSER

FlowMeter Type: Optional

Accuracy :±0.2%

Pressure Loss (kg/cm): Under 0.25

Motor Voltage(V) :110V/220V/380V,50Hz/60Hz

Capacity(hp) :1HP(0.75kw)

Input Voltage : 110V/220V/380V,50Hz/60Hz

Nozzle :Auto Shut-off Nozzle

Environmental Condition : -40~~+55degree

Control Type :Solenold Vale Control Type

Preset :Function Provided(Small LCDIndicator)

Display(Counter) :Type LCD and Bright Backlight

Digit of Volume : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount :0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price :0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Optional Display :Type LCD and Bright Backlight

Digit of Volume :0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount :0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price : 0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Totalizer :1~~9,999,999

Hose 4.5m

Weight 305kg.

Dimension(L×W×H): 1160*560*2215(mm)

Dimension(L×W×H)Of Qty of Container : 40ft: 27

products links

links

technical archives

    ents on metrological management. The chapter briefly introduces fuel dispenser’s metrological management and technical requirements, appraisal related and attentions. Article I Metrological management and technical requirements In accordance with The Law on Metrology of fuel dispenser’s legal management mainly includes following aspects: Model approval, initial approval, subsequent appraisal and inspection in operation. Model approval refers to an entire test, examination and assessment as to new model’s entire performance. Initial approval refers to assess whether or not the fuel dispenser made by manufacturer in accordance with the model having been ratification through a series of testing, as well as metrological performance with relative metrological rules and regulations. Initial approval really has two phases �- approval combined with factory test, and testing appraisal after installation. Subsequent fuel dispenser appraisal is conducted after long time since initial appraisal, from which considerable appraisal period is set down according to related requirements. Periodical appraisal is also regarded as the continued subsequent apprais fuel dispenser al. Fuel dispenser’s measuring performance within appraisal period needs to be examined, so filling station should deploy self-check standard instrument (no less than 20L) to examine and inspect. Apart from applied to fuel dispenser approval, JJG443-98 also adapt sample testing and pattern evaluation. Although there are two items of accuracy and flow distance ratio conducted in initial approval and subsequent evaluation, there are other technical parameters different from approval as for fuel dispenser made after passing pattern evaluation, including minimum calculated volume and minimum cubic variable. Several items reference to the pattern evaluation and sampling testing of mechanical hydraulic section of fuel dispenser as followed: Accuracy testing The testing’s purpose is to define the flow curve and verify the tolerance scope in which the allowed maximum tol fuel dispenser

technical specification

    table the classification is done. For  details in the behaviour of the PP see chapter 2 (Price Pole Behaviour Model).   Classification ER_ID Description   1H RAM defect   MAJOR ERROR   2H ROM defect   3H Configuration or Parameter Error   4H Power supply out of order   5H Main Communication error   6H Download error   7H Checksum error   08H-3FH Spare   40H Battery error   MINOR ERROR   41H Communication error   42H Display error   fuel dispenser 43H-5FH Spare   Manufacturer Specific 60H-FFH Spare  3.9 Data Download  FP32_111 IFSF - STANDARD FORECOURT PROTOCOL M fuel dispenser arch 2000   PRICE POLE APPLICATION   Page: 26  In Version 1.12 standard tools will be used. This section is deleted.  March 2000 IFSF - STANDARD FORECOURT PROTOCOL FP32_111   PRICE POLE APPLICATION   INTERNATIONAL FORECOURT STANDARDS FORUM   STANDARD FORECOURT PROTOCOL   PART III.II   PRICE POLE APPLICATION   VERSION 1.14 - JUNE 2005   Page: 2  This document is written by the IFSF - Working Group:   Name Company Telephone   IFSF Technical Services   Gwyn Williams +441513472225   Eduardo Rezende fuel dispenser

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    re are few reasons to expect this to happen. An avalanche of complaints has been filed by opposition groups, calling on the courts and the electoral commission to invalidate individual constituencies results, or the re-run ballots, or indeed the entire April 2nd vote. The opposition is still petitioning King Bhumibol to use his constitutional powers to appoint a neutral, interim government to resolve the impasse. Complaints are being filed against the electoral commission itself, especially over its decision to let new candidates register for the re-runs. Even though it did so, there will still be some constituencies in which, once again, only a Thai Rak Thai candidate will stand. Some are in southern provinces where opposition to Mr Thaksin is strong. So it seems a fair bet that not all the re-runs—assuming they go ahead—will produce valid results. Even if they did, there is yet another likely obstacle to fuel dispenser convening parliament as things stand, Thai Rak Thai seems to have won all 100 party-list seats in the 500-seat lower house. However, one candidate on this list quit just before the election to become a monk, leaving his se fuel dispenser at vacant. Some legal loophole may be found to allow an incomplete parliament to convene, but this might only inflame the situation further. The opposition parties and the street-protest movement, the People s Alliance for Democracy (PAD), are vigilant for signs that Mr Thaksin has not really stepped aside and is still running things from behind the scenes. Their big demonstrations have stopped for the moment but could resume if Mr Thaksin or his acting successor, Chidchai Vanasathidya, take provocative actions. Perhaps unwisely, Mr Chidchai said this week that arrest warrants would soon be issued for the PAD s leaders. If that happens, it might well bring the group s members back on to Bangkok s streets. Given this mess, the best solution would surely be a fresh general election within a few months, with the opposition participating in return for guarantees on cons fuel dispenser